Bid Number: 2023-602-1
Bid Title: Tanner Bridge Road Safety Improvements
Category: Road and Bridge Construction Projects
Status: Closed

Description:

The proposed work consists of removal, clearing and grubbing, excavating, grading, aggregate base, asphalt paving, guardrail, driveway reconstruction, culvert replacement, pavement marking, seeding and mulching, erosion control, and other miscellaneous work necessary to remove, realign, widen and replace approximately 0.38 miles of Tanner Bridge Road near Jefferson City, Missouri. 

Publication Date/Time:
10/26/2025 8:00 AM
Closing Date/Time:
11/21/2025 9:00 AM
Submittal Information:
COLE COUNTY COMMISSION COURTHOUSE ANNEX
Bid Opening Information:
9:00 am, 11/21/2025
Pre-bid Meeting:
9:00 am, 11/13/2025
Contact Person:
Matt Prenger
Download Available:
www.colecounty.org
Plan & Spec Available:
Plans and specifications may be viewed and downloaded online in the bids section at www.colecounty.org. A hard copy of the plans and specifications will not be provided. All contractors wishing to bid on this project shall submit the plan holder contact information form found in the specifications to ccpwprojects@colecounty.org prior to the bid opening.
Business Hours:
7:30 AM - 4:00 PM
Fax Number:
573-636-8389
Qualifications:
Plans and specifications may be viewed and downloaded online in the bids section at www.colecounty.org. A hard copy of the plans and specifications will not be provided.
All contractors wishing to bid on this project shall submit the plan holder contact information form found in the specifications to ccpwprojects@colecounty.org prior to the bid opening.
Special Requirements:
Note to Bidders: Cole County 2023-602-1: Tanner Bridge Road Safety Improvements is being let in required conjunction with BRO-R026(025): Tanner Bridge Road – Road and Bridge Replacement, which begins at the Southern termini of 2023-602-1. In order to be considered for award, contractors MUST submit a bid for both Cole County 2023-602-1 AND BRO-R026(025). See JSP “Required Combination of Projects” in the project bid manual for additional information.
The project will be awarded to the lowest, responsive, responsible bidder, determined by the combined total of the bids for both projects.
Failure to submit a bid for either project will result in the bid being deemed non-responsive or irregular, and it will be rejected from consideration.