The proposed work includes removals, grading, excavating, culvert installations, rock blanket, aggregate base, asphalt paving guardrail, seeding/mulching, bridge construction and miscellaneous work associated with the construction of a single span 82’-6” long pre-stressed concrete girder bridge. The work also includes, as an alternate, waterline relocation along the right-of-way within the project limits.
|